ABB RDNA-01 Manual do Utilizador Página 39

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 320
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 38
ACS550-01/U1 User’s Manual 39
Start-up, control with I/O and ID Run
After completing a set-up task, the Start-up Assistant suggests the
next one.
Press (when
is highlighted) to continue with the
suggested task.
Press key
to highlight and then press to move to
the following task without doing the suggested task.
Press to stop the Start-up Assistant.
SAVING A USER PARAMETER SET AND FINAL CHECK
The start-up is now completed. However, it might be useful at this
stage to set the parameters required by your application and save
the settings as a user parameter set as instructed in section User
parameter sets on page 83.
After the whole set-up is completed, check there are no faults or
alarms shown on the display and the panel LED is green and does
not blink.
The drive is now ready for use.
OK
Continue
Skip
OK
EXIT
Do you want to
continue with
application setup?
Continue
Skip
EXIT
OK
00:00
CHOICE
REM
Vista de página 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 319 320

Comentários a estes Manuais

Sem comentários