ABB RCNA-01 Manual do Utilizador Página 82

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 474
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 81
78 Start-up and control panel
ACH550-01 User's Manual
Group 99: START-UP DATA parameters and the internal
motor parameters.
User set 1 must be first saved using parameter 9902
APPLIC
MACRO and then uploaded to the control panel before
downloading is possible.
DOWNLOAD USER SET 2 – Copies the parameters in user
set 2 from the control panel to the drive. As DOWNLOAD
USER SET 1 above.
DOWNLOAD OVERRIDE SET – Copies the parameters in
the override set from the control panel to the drive.
The override must be first saved (automatically, as defined by
Group 17: OVERRIDE) and then uploaded to the control
panel before downloading is possible.
Vista de página 81
1 2 ... 77 78 79 80 81 82 83 84 85 86 87 ... 473 474

Comentários a estes Manuais

Sem comentários