ABB FPBA-01 Manual Página 114

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 134
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 113
Starting up fieldbus communication and programming the ABB PLC (multi-axis system)
114
15. In the netConnect field, click PPO-5, 4PKW + 10 PZD <Slot 1>. -> A list of inputs
and outputs appears.
Name the signals. In this example configuration, Input_1 is named field_in1 and
Output_1 field_out1.
Note: You can name all signals here and they will be automatically in use in the
Control Builder.
16. Name the signals in the same way for the second drive: Input_1 for field_in2 and
Output_1 field_out2.
Tool/Step
Setting up the communication
Vista de página 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 133 134

Comentários a estes Manuais

Sem comentários